Invoice

From:

9F Airborne Road,
Albany,
Auckland

GST Number
114280828

Invoice Number INV-5102
Invoice Date 29/03/2021
Due Date 05/04/2021
Total Due $1,000.00
To:
X Studio

501 38 Khyber Pass Road

Hrs/Qty Service Rate/PriceSub Total
1 Ceiling works

A. CEILING

Insulation cotton supply and installation for Ceiling.
10mm GIB Panel supply and installation for Ceiling.
GIB Panel Included, Delivery to level 5 of the building lifting labour included.
Plaster ceiling stopping.
Spray Painting ceiling Resene filmpro black at least 2 coating, Resene
Eighth Black white or Equivalent for interior wall paint, Contract filler on wall included
Scaffolding delivery and setup onsite included.
Ceiling works not including any fire protection and fire alarm works,extra cost if need remove fire sparkler, fire alarms, reinstall after gib installed

$18,820.00$18,820.00
1 Lighting works

C. LIGHTING

Prewire and install the lights and switches as illustrated in plan X Studio(3)
Prewire and install the sockets as illustrated in plan X Studio(3)
Prewire and install two 2 x 2.5mm2 + E cable for the two groups of office
tables, each 2.5mm2 +E for one group of office tables (as persuspended wiring in plan X Studio(3) )
Prewire, supply and install MCBs for the new feeds of cable in the switchboard.
Supply of Metal box and Intumescent Pad for sockets and switches which located in the fire wall.
Recessed Lighting track 56mm depth,28mm width install on ceiling,
filling cover and painting included for all wire slots, cutting on wall.
The quotation does not allow:
The quotation does not allow supply of any lights, switches and sockets.
The quotation does not allow supply of RCD in the switchboard. Upgrade
to add the RCD for all the new circuits incurs $950+gst extra charges.
The quotation does not allow any fire seal works where the fire wall
needs to be cut in order to run the cable inside the wall

$9,840.00$9,840.00
1 50% of A+C First Payment $14330+gst, $16479.50 included GST
$0.00$0.00
1 Network cable cat6a x23
$437.00$437.00
1 extra downlight x8
$860.00$860.00
1 RCD for all the new circuits incurs $950+gst
$950.00$950.00
1 Paint Door
$500.00$500.00
1 Prewire,supply and install mcb for powerpoint

17/03/2021 Prewire,supply and install mcb for powerpoint $130
22/03/2021 Prewire and connect 3 phase caable for floor sanding Team $220
9/04/2021 Disconnect 3 Phase cable $80

$430.00$430.00
1 Paint works

Ceiling bulkhead repainting and touchup. including labour and material cost.

$1,500.00$1,500.00
Sub Total $33,337.00
GST $5,000.55
Paid -$37,337.55
Total Due $1,000.00

Bank Name: BNZ
Account Number: 02-0108-0486188-00
Account Name: Master Design Ltd